Navigation:  GOLDTrak PC What's New > GOLDTrak Version 7.9.36 >

Improvement Information Enhancements

Navigation:  GOLDTrak PC What's New > GOLDTrak Version 7.9.36 >

Improvement Information Enhancements

Previous pageReturn to chapter overviewNext page  Print this Topic

CMP: 18812

 

Enhancements have been added to the Improvement Information screen, including new buttons/fields and options to hide unneeded fields. These enhancements are as follows:

 

A new <Improvement Information> button can be added to user screens. Clicking this button opens the Improvement Information screen as a pop-up dialog.

 

New fields have been added to the LOAN_REQ_MISC7 group for showing or hiding fields on the Improvement Information screen. These fields are as follows:

 

oUse IMPR_HIDE_CONTRCT_M7 to indicate whether the Contractor Info field group should be hidden.

oUse IMPR_HIDE_MDL_SER_M7 to indicate whether the Model and Serial Number field group should be hidden.

oUse IMPR_HIDE_IMP_PER_M7  to indicate whether the Improvement Performance field group should be hidden.

oUse IMPR_HIDE_REB_INC_M7 to indicate whether the Rebates/Incentives field group should be hidden.

oUse IMPR_SHOW_ESTPROD_M7 to indicate whether the Annual Production field (EST_ANNUAL_PROD_IMP, see below) should be visible.

oUse IMPR_SHOW_SYSSIZE_M7 to indicate whether the System Size field (SYSTEM_SIZE_IMP, see below) should be visible.

oUse IMPR_SHOW_WATTAGE_M7 to indicate whether the Wattage field (WATTAGE_IMP, see below) should be visible.

 

If the Model and Serial Number, Improvement Performance, and Rebates/Incentives field groups are all hidden, this dialog will appear smaller.

 

New fields have been added to the LOAN_REQ_MISC7 group for indicating information on the Improvement Information screen. These fields are shown in the table below:

 

Mnemonic

Description

ADVANCE_PERF_IMP

Adv Perf

CHANGED_BY_IMP

Changed By

CHANGED_WHEN_IMP

Changed Date

COMMENTS_IMP

Comments

CONTRACTOR_ADDR_IMP

Address

CONTRACTOR_CITY_IMP

City

CONTRACTOR_EMAIL_IMP

Email

CONTRACTOR_ID_IMP

Contractor ID

CONTRACTOR_NAME_IMP

Contractor Name

CONTRACTOR_PHONE_IMP

Phone

CONTRACTOR_STATE_IMP

State

CONTRACTOR_ZIP_IMP

Zip

DISBURSE_TYPE_IMP

Disbursement Type

EFFICIENCY_IMP

Efficiency

ENERGY_STAR_IMP

Energy Star

EST_ANNUAL_PROD_IMP

Est Annual Production

FINANCED_AMT_IMP

Financed Amt

FORM_SEQ_IMP

Form Sequence No

IMPROVEMENT_DESC_IMP

Description

IMPROVEMENT_ID_IMP

Improvement ID

INCENTIVE_AMT_1_IMP

Incentive Amt 1

INCENTIVE_AMT_2_IMP

Incentive Amt 2

INCENTIVE_AMT_3_IMP

Incentive Amt 3

INCENTIVE_AMT_4_IMP

Incentive Amt 4

INCENTIVE_DESC_1_IMP

Incentive Desc 1

INCENTIVE_DESC_2_IMP

Incentive Desc 2

INCENTIVE_DESC_3_IMP

Incentive Desc 3

INCENTIVE_DESC_4_IMP

Incentive Desc 4

INST_IMP

Inst No

JOB_COST_IMP

Job Cost

JOB_HOURS_IMP

Job Hours

LENDER_NUMBER_IMP

Loan Request No

MANUFACTURER_ID_IMP

Manufacturer ID

MANUFACTURER_NAM_IMP

Manufacturer Name

QUALIFY_IMP

Qualifying

QUANTITY_IMP

Quantity

REMOVE_EQUIPMENT_IMP

Remove Equipment

SALES_EMAIL_IMP

Sales Email

SALES_PERSON_ID_IMP

Sales Person ID

SALES_PERSON_IMP

Sales Person

SALES_PHONE_IMP

Sales Phone

SEQUENCE_IMP

Sequence

SYSTEM_SIZE_IMP

System Size

TITLE_QUALIFY_IMP

Title Qualify

TOTAL_INCENTIVE_IMP

Total Incentive

WATTAGE_IMP

Wattage

WHOLE_HOURS_IMP

Whole Hours

WHOLE_HOUSE_IMP

Whole House

©2021 GOLDPoint Systems. All rights reserved.