Navigation: GOLDTrak PC What's New > GOLDTrak Version 7.9.7 - 7.9.10 >
CMP: 12547
Similarly to CMP 12620, we have also added an office-level option to use Delta Save. Delta Save is another project designed to improve the amount of time to edit, save, fund, and board loan applications. Since this is such a big change to the system, we created an option for you to be able to test turning on this option for just one office (or a few offices) before converting completely over to using Delta Save.
Before testing these steps, make sure core (host) institution option NDLT is on. If it is not on, Delta Save will not occur, regardless of what options are set up in GTPC Setup.
•When a loan request is about to be saved, GTCOM will read the DO_DELTA_SAVE_IO options, and determine whether to do a Delta Save or not.
•DO_DELTA_SAVE_IO can be set at both the office and institution level (office 0). If it is "Y" or "N" at the office level (user's office), that overrides the setting in office 0 (institution). If it's blank at the office level, the office 0 setting will be used.
•If DO_DELTA_SAVE_IO is blank at both the office and institution level, Delta saving will be allowed by default.
•If the host Delta option (NDLT) is turned off, Delta saving will not happen regardless of the DO_DELTA_SAVE_IO settings.
•A new trace is being added to provide information about checks that are saved to the host. Component: "FPSTiming," Message: "Saving CHECK_INFO data to host," Data: first 53 bytes of the check record.
Your GOLDPoint Systems account manager can help you set up this option on an institution or office level.